Self-consumption photovoltaic facility to meet the energy demand of the building located in the Finsa factory in Ourense. Its purpose is to provide greater energy independence, reducing energy costs by no longer consuming part of the energy from the grid and reducing energy transmission losses by decentralising electricity generation. The ultimate goal is also to achieve a reduction in greenhouse gas emissions.
The solar photovoltaic system will consist of 2,634 monocrystalline silicon panels of 55 Wp each, giving the facility a peak power of 1,448.7 kWp. The panels will be located on various decks, arranged in rows and columns to form tables. The facility is covered by the ‘self-consumption without surplus’ modality approved in Spanish Royal Decree 244/2019, which regulates the administrative, technical and economic conditions for the self-consumption of electrical energy.
The operation of the plant will allow a reduction of 776 t CO2/year.
The investment is carried out in Orember (San Cibrao das Viñas, Ourense), as part of the incentive programme 2 linked to self-consumption and storage in the service sector and other productive sectors, within the framework of the European Recovery, Transformation and Resilience Plan, financed by the European Union - NextGenerationEU.
Investment: € 986,000
Financing: € 133,259.70
File No.: IN421W-5
To download the Strategic Plan, click below on 'See documentation'.