FEADER - reforestation

Finsa has been a beneficiary of aid, co-financed by the European Agricultural Fund for Rural Development (FEADER) within the framework of the rural development program of Castilla y León 2014 - 2020, aimed at reforestation and restoration of forest areas in the province of Zamora.

FILE RD/49/0004/17 Restoration of damage caused to forests by fires.
Works consisting of the restoration of damage caused by fires in an area of ​​89.32 hectares located in the Municipal District of Trabazos.
Land preparation by mechanized drilling and subsoiled strips.
Chosen species: Pinus pinaster to a sap in a container.
Planting density: 1,600 feet/ha.
Adaptation of 1.86 km. track, through regularization and widening with the contribution of gravel and installation of water passages.

Total amount of aid €177,333.15
EAFRD financing (53%) €93,986.57


FILE FS/49/0003/18 Reforestation and creation of forest areas
Works consisting of the repopulation of an area of ​​88.32 hectares located in the Municipal District of Trabazos.
Land preparation by mechanized drilling and subsoiled strips.
Chosen species: Pinus pinaster to a sap in a container.
Planting density: 1,600 feet/ha.
Total amount of aid €176,415.85
EAFRD financing (53%) €93,500.40


FILE FS/49/0001/19 Reforestation and creation of forest areas
Works consisting of the repopulation of an area of ​​28.98 hectares located in the Municipal District of Trabazos.
Land preparation by mechanized drilling.
Chosen species: Pinus pinaster to a sap in a container.
Planting density: 1,600 feet/ha.
Total amount of aid €57,161.60 EAFRD financing (53%) €30,295.65


File RD/49/0004/18
Forest fire damage restoration
Work consisting of the restoration of damage caused by fires in an area of ​​74.80 hectares located in the Municipal District of Jobs.
Land preparation subsoiled strips.
Chosen species: Pinus pinaster to a sap in a container.
Planting density: 1,600 feet/ha.
Adaptation of 2.46 km. runway, through regularization and widening with bulldozer.
Total amount of aid €145,379.50 EAFRD financing (53%) €77,051.14